A construction draw is a scheduled release of loan money as work is completed. A reimbursement pays you back for costs you already covered out of pocket. In practice the two overlap: most construction loans release draws after work is in place, so the borrower or contractor often carries costs for a short window first. The real question is how much you must front, and for how long, before the lender’s money arrives.
This guide separates the terms, shows how each affects cash flow, and lists what lenders typically ask for before they fund. Then we cover how to choose a structure that keeps a ground-up project moving.
A construction loan is not paid out in one lump sum. The lender holds the budget and releases it in installments, called draws or advances. In Florida, for example, draws are each funding of a construction loan to the borrower, subject to the loan agreement, which makes the loan documents the controlling rulebook.
The paperwork has its own vocabulary. A draw request is specifically a demand for payment from a lender, while a payment application is the broader term for a request sent to an owner or general contractor. If you are a contractor billing an owner, you submit a pay application. If you are a borrower asking your lender for money, you submit a draw request. Many projects involve both, one feeding the other.
A draw schedule normally follows project phases, for example:
Each phase carries a portion of the budget. When the phase is done and verified, that portion is released.
Reimbursement is a payment model in which you pay first and are repaid afterward. In loan terms, the lender funds costs that have already been incurred and proven. Draw requests may cover costs for work in place that the lender’s inspector has certified, and the supporting documents include paid receipts, invoices and lien releases.
So a draw is often a form of reimbursement. You or your contractor pays the framers, then the lender repays that cost after inspection. The difference is mostly about timing and who is exposed:
| Draw (progress-based) | Reimbursement (cost-incurred) | |
|---|---|---|
| What triggers payment | A completed phase or milestone | Proof that you already paid specific costs |
| Who carries cost first | Shared; depends on the schedule and contractor terms | You or your contractor |
| Typical proof | Inspection report, percent-complete, lien waivers | Paid invoices, receipts, lien releases, inspection |
| Best for | Larger projects with defined phases | Smaller builds and renovations with flexible vendors |
| Main risk | Delay between finishing work and funding | Larger cash outlay before any repayment |
The Texas Bankers Association describes the same split from the bank’s side: standard plans based on costs incurred, and progress plans based on completion. Progress plans are normally used for commercial projects, release funds by phase, and hold back 10% to 20%.
The details vary by lender, but the sequence is consistent. For a deeper walkthrough, see our guide on how construction loan draws work.
The contractor finishes the phase and bills for it. You collect invoices, proof of payment and lien waivers from the contractor and subcontractors.
The package goes to the lender. One construction consulting firm lists an updated construction schedule, lien waivers and lender-appointed site visit reports among the items in each draw package. Industry forms such as AIA G702 and G703 often show up here, and the same source notes that final retainage may require an approved punch list and final lien waivers.
Each draw after the first requires a site inspection and a visit report. The inspector confirms the work is physically in place and compares it to the budget line items. This is the step that turns “we say it is done” into “the lender can verify it.”
Once the package and inspection are clear, funds go out, either to the borrower or directly to the contractor or subcontractors, depending on how the loan is set up. Frequency is set by the loan agreement: often monthly or bi-monthly, with proof of payment and lien waivers for each advance.
Lenders typically hold back a slice of each draw until the job is finished. The Texas Bankers Association notes that lenders typically hold back 10 to 20 percent as retainage under progress plans. The final draw releases what is left once the punch list and final waivers are in.
The gap between finishing work and receiving funds is where most projects get squeezed. Lenders have review windows written into their documents. One draw-administration firm’s standard terms say a lender need not disburse earlier than 10 business days after receiving the requisition and every required item. Your own loan agreement may be faster or slower, so read the clause rather than assume.
What this means in numbers: if your framing crew bills $85,000 and you must wait two weeks for inspection and review, you or your contractor carry $85,000 for that time. Run that across five or six phases and the buffer you need is not trivial.
Three habits shorten the gap:
If a build runs past its term, you will want a plan for that as well. Our construction loan extension checklist covers what to prepare.
Many borrowers assume they can front some costs and be repaid later like a contractor would. With your own equity, that is often not the case. Construction loans typically include an equity requirement where the borrower invests a set percentage of project costs, often upfront, before any loan advance is permitted. The same source warns that most loans restrict the borrower from reimbursing themselves for equity, so the equity is spent early in the timeline.
Practical consequences:
For more on how equity and leverage interact, read our investor’s guide to the role of equity in bridge loans. Our overview of construction loan requirements covers down payment and credit expectations.
Expect some version of this list with every request:
Lenders also have a duty to the project. Bank guidance says lenders must monitor disbursements so funds advanced are used solely for the project being financed, which is why they insist on paper trails. A broker can help you understand how different lender types handle this; one mortgage broker versus bank comparison shows how the two routes differ on documentation and speed. For Florida builds, our rundown of Florida construction loan requirements lays out the state specifics.
Use these criteria when you compare terms:
For projects with a clear scope and a seasoned builder, a milestone draw schedule is usually the cleaner path. For renovations with many small vendors, a cost-incurred approach with frequent, smaller requests can keep paperwork manageable. If you are unsure how underwriting sets these terms, see how construction loan underwriting works for developers.
Most delays we see do not come from the work. They come from the gap between finishing a phase and getting paid for it. Borrowers who understand the draw process before closing, and who pick a lender built around speed, protect their margin and their schedule.
At Capital Funding we are a direct lender backed by a family office, which means decisions on draws are made by people with discretion over the capital, not passed through layers of committee. We built our programs for investors and developers who need to keep a build moving, from fix-and-flip to ground-up construction, and we finance projects that other lenders will not, including ultra luxury homes over $10 million.
Our advice: ask every lender the same four questions before you sign. How many business days from complete request to funds? Who schedules the inspection? How much is retained and when is it released? Can funds go directly to subcontractors? A clear answer on each is a good sign. We are glad to walk through ours with you before you commit.
Daly Kay DiNatale
If you are planning a build and want a draw structure that supports your schedule, our Ground Up Construction Program is designed for developers and builders who need speed and flexibility. Published rates run 8.99% to 10.99%, with origination fees of 1.50% to 3.00%. We have closed more than $1 billion in loans and hold an A+ rating with the BBB.
For shorter-term needs such as acquiring and repositioning property, see our Hard Money Loan Program. Already have land and want to move to construction? Read about how to convert a land loan into construction financing. Ready to talk through your project? Start at capitalfunding.com.
Not exactly, but they are closely related. A draw is a staged release of loan funds, usually tied to completed and verified work. Reimbursement repays costs you have already paid. Many lenders fund draws for work already in place, so a draw often works like a reimbursement.
Usually not. Lenders commonly require equity to be invested first, and many loan agreements restrict borrowers from reimbursing themselves for it. Check your loan agreement and ask the lender how land value is credited.
It depends on your loan agreement. Some documents allow the lender at least 10 business days after a complete request, and inspections add time. Submitting complete packages and scheduling inspections early are the best ways to shorten the wait.
Retainage is a percentage the lender or owner withholds from each draw until the job is complete. Under progress plans, bank guidance puts it at 10% to 20%. It is released after final inspection, the punch list and final lien waivers.
It depends on the loan structure. Funds may go to the borrower, or directly to the general contractor or subcontractors. Paying subcontractors directly can make lien waivers easier to manage.